190E 2.6 (201.029) L6-2.6L (103.942) (1987)
Sunroof / Moonroof Weatherstrip: Service and Repair
Removal/Installation of Sealing/Rails
Sliding roof .......................................................................................................................................................................................... Open, do not remove.
Installation position of sealing ............................................................................................................... Mark on roof cutout at connecting points (arrows).
Sealing (1) .................................................................................................................................................................... Pull out of holding rail 2, 3, 4 and 5.
Wind deflector .................. Remove and install See: Roof and Associated Components/Sunroof / Moonroof/Sunroof / Moonroof Windguard/Service and
Repair
Screw (6) ......................................................................................................................................................................................... Screw 6 each out and in.
Holding rail (2) ............................................................................................................................................ Remove and install (refer to installation note).
Screw (7) and (8) ............................................................................................................................................................................. Screw 8 each out and in.
Holding rail (3) and (4) ..................................................................................................................... Slide toward the rear and remove in upward direction.
Holding rail (5) Can be removed and installed only after removing pop-up sliding roof frame and drilling-out rivets (11 each).
Sealing (1) Push into holding rail 2, 3, 4 and 5. The grooves on plug-in molding should face upwards.
Installation note
To make sure that the sealing (1) obtains an adequate hold in holding rail 2, 3 and 4, hold a 3 mm gap gauge in-between holding rail and roof paneling.