300CE (124.051) L6-3.0L (104.980) (1990)
To make sure that the gasket (1) obtains an adequate hold in holding rails 2, 3 and 4, a gap dimension of 3 mm between holding rail and roof panelling
should be maintained.
To make sure that the gasket (1) obtains an adequate hold in holding rails 2, 3 and 4, a gap dimension of 3 mm between holding rail and roof panelling
should be maintained.