300E (124.030) L6-3.0L (103.983) (1986)
1.
Cut out sound absorbing material from inner side of right splash guard (Figure 1).
2.
Measure and cut a hole (35 mm) with a circular saw cutter as specified, for coolant hose, on outer side of right splash guard (Figure 2).
3.
Cut and work work out an opening for the reinforcement tube (arrow, r=15) and torsion bar (5/6) on left and right splash guards (Figure 3).
4.
Install rubber grommet (5) in right splash guard (Figure 4).