mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Drive/Propeller Shaft - Vibration Reduction|Page 5441 > < Drive/Propeller Shaft - Vibration Reduction
Page 2
background image

FIGURE 2 - BALANCING NUT ON BOLT NO. 1

7.

Install 1.5 gram balancing nut on the exposed thread of bolt no. 1 (Figure 2).

8.

Lower vehicle and repeat check for vibration as in step 4.

9.

If necessary, remove balancing nut and place on next consecutive bolt until all six locations have been tried. Record the best of the 6 possible
locations for the balancing nut.

FIGURE 3 - 3 GRAM BALANCING NUT

NOTE:

In case the procedure in steps 8 and 9 does not produce a satisfactory result, then the 1.5 gram balancing nut must be replaced with a 3 gram
nut (arrow, Figure 3).

Re-evaluate the humming noise.

If satisfactory results still cannot be obtained, install (in addition to the 3 gram nut) a 1.5 gram nut on one of the adjacent bolts. Determine the best
location by repeating step 4.

For example:

In Figure 3 the 3 gram balancing nut is installed on bolt no. 4. The additional 1.5 gram nut should therefore be installed on bolt no. 3 or
no. 5, as required.

NOTE:

The 5 gram balancing nut is only required in extreme, special cases.

Drive/Propeller Shaft - Vibration Reduction|Page 5441 > < Drive/Propeller Shaft - Vibration Reduction