mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

With Digital Tester (RIV Method)|Page 2089 > < With Digital Tester (RIV Method)|Page 2087
Page 4
background image

2.  Attach injection pump and recheck begin of delivery.

Install damper, adjust.  See: Diesel MFI Pump/Service and Repair/Removal and Installation of Injection Pump

3.  Attach injection pump.

4.  Unscrew overflow pipe and pipe connection.

5.  Fit pipe connection.

Remove delivery valve holder (6), checking whether delivery valve (4) moves freely in holder (6).

Insert delivery valve holder (6) with annular groove pointing downward.

Attention!  Starting with Bosch production date "249" (September 1982) the annular groove should point upwards.

The copper sealing ring is located beneath the delivery valve holder and need not be exchanged.

Smear thread of pipe connection (1) with oil, insert connection and torque to 40-50 Nm in one step.

6.  Fit injection lines and vent injection system.  See: Service and Repair

7.  Check throttle linkage and adjust, if required.

8.  Run engine and check all connections for leakage. Any pipe connection that is leaking has to be exchanged. In this case exchange copper

sealing ring beneath delivery valve holder.  See: Diesel MFI Pump/Service and Repair/Replacement of Pipe Connection, Delivery Valve or
Sealing Ring

With Digital Tester (RIV Method)|Page 2089 > < With Digital Tester (RIV Method)|Page 2087