mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

With Digital Tester (RIV Method)|Page 2078 > < With Digital Tester (RIV Method)|Page 2076
Page 5
background image

Note:  Starting Bosch production date "249" (September 1982) modified delivery valve carriers will be installed. On these carriers, the ring
groove must be pointing upwards.

13.  Slightly lubricate threads of pipe connection (1), screw-in and tighten to 40-50 Nm in one step.

14.  Fit injection line and vent injection system.  See: Service and Repair

15.  Run engine and check all connections for leakage. Any pipe connection that is leaking has to be exchanged. In this case, remember to

exchange copper sealing ring beneath delivery valve holder.  See: Diesel MFI Pump/Service and Repair/Replacement of Pipe Connection,
Delivery Valve or Sealing Ring

With Digital Tester (RIV Method)|Page 2078 > < With Digital Tester (RIV Method)|Page 2076