mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Heater Control Valve > < Expansion Valve|Removal|Page 4941
Page 3
background image

4. Screw back hose lines on expansion valve.
5. Evacuate air conditioning system, fill up again, check for function and leaks.
6. Reinstall air duct left and attach cable control.
7. Install air hose for lefthand round nozzle and cover at left under instrument panel.
8. Install instrument cluster.
9. Mount steering wheel with new screw.

TIGHTENING TORQUES:

Pressure hose on expansion valve:

with Cu seal:

30±5 Nm (3.0±0.5kpm)

without Cu seal:

45±5 Nm (4.5±0.5kpm)

Compensating line on evaporator pipe:

with Cu seal:

17±2 Nm (1.7±0.2kpm)

Expansion valve on evaporator pipe:

with Cu seal:

45±5 Nm (4.5±0.5kpm)

without Cu seal:

55±5 Nm (5.5±0.5kpm)

Heater Control Valve > < Expansion Valve|Removal|Page 4941