mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

A/T - Modifications and Innovations|Page 3618 > < A/T - Modifications and Innovations|Page 3616
Page 1
background image

Vacuum Regulator Valve: Adjustments

A. Adjustment Of Vacuum Control Valve (MW Pump)

1

Push regulating lever (1) to full throttle stop (2).

2

Loosen ball head (4) and displace in slot in such a manner that actuating lever (8) is also resting against full load stop (6).

3

Tighten ball head (4), then check once again whether both levers are reaching full load stops at the same time.

Installed up to September 1980.

4

The basic dimension (a) of connecting rod (5) is 122 mm.

Installed starting October 1980.

5

The basic dimension of the connecting rod (5) is 118 mm.

B. Adjustment Of Vacuum Control Valve (M/RSF Pump)

A/T - Modifications and Innovations|Page 3618 > < A/T - Modifications and Innovations|Page 3616