E 300 (124.131) L6-3.0L DSL (606.910) (1995)
To make sure that the gasket (1) obtains an adequate hold in holding rails 2, 3 and 4, a gap dimension of 3 mm between holding rail and roof panelling
should be maintained.
To make sure that the gasket (1) obtains an adequate hold in holding rails 2, 3 and 4, a gap dimension of 3 mm between holding rail and roof panelling
should be maintained.