E 300 (124.131) L6-3.0L DSL (606.910) (1995)
Injection Timing: Adjustments
Adjusting start of delivery with digital tester (RIV method) after testing
Preceding work:
Testing start of delivery. Refer to Testing Start of Delivery With Digital Tester (RIV Method) See: Testing and Inspection
Connection diagram of digital tester without adapter (with adapter, see Testing Start of Delivery With Digital Tester (RIV Method) See: Testing
and Inspection
Slacken securing bolts (arrows) on injection pump flange and on supporting bracket.
Run engine at idle speed.
Adjust RI value (indirect start of delivery) by turning the adjusting device (30/1).
RI specification: 14° ±0.5° ATDC.
Direction of rotation of adjusting screw (30/1)
To right = start of delivery retarded
To left = start of delivery advanced
Note:
If the adjustment facility is insufficient, the injection pump must be turned over. See removing and installing injection pump See: Diesel
MFI Pump/Service and Repair
Switch engine off.
Tighten securing bolts (arrows) at injection pump flange and at supporting bracket.
Tightening torque 20-25 Nm.
Disconnect testers.
Screw in plug (arrow) at governor (10/6).
Tightening torque 30-35 Nm.
Perform leak test with engine running.
Check engine oil level, adjust to correct level if necessary.
Special tools