mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Injection Timing|System Diagnosis|Page 2688 > < Injection Timing|System Diagnosis|Page 2686
Page 1
background image

Injection Timing: Adjustments

Adjusting start of delivery with digital tester (RIV method) after testing

Preceding work:

Testing start of delivery. Refer to Testing Start of Delivery With Digital Tester (RIV Method)  See: Testing and Inspection

Connection diagram of digital tester without adapter (with adapter, see Testing Start of Delivery With Digital Tester (RIV Method)  See: Testing
and Inspection

Slacken securing bolts (arrows) on injection pump flange and on supporting bracket. 
Run engine at idle speed. 
Adjust RI value (indirect start of delivery) by turning the adjusting device (30/1).

RI specification: 14° ±0.5° ATDC.

Direction of rotation of adjusting screw (30/1)
To right = start of delivery retarded
To left = start of delivery advanced

Note:

If the adjustment facility is insufficient, the injection pump must be turned over. See removing and installing injection pump  See: Diesel
MFI Pump/Service and Repair

Switch engine off. 
Tighten securing bolts (arrows) at injection pump flange and at supporting bracket.

Tightening torque 20-25 Nm.

Disconnect testers.
Screw in plug (arrow) at governor (10/6).

Tightening torque 30-35 Nm.

Perform leak test with engine running.

Check engine oil level, adjust to correct level if necessary.

Special tools

Injection Timing|System Diagnosis|Page 2688 > < Injection Timing|System Diagnosis|Page 2686