E 500 (124.036) V8-5.0L (119.974) (1994)
Oil Cooler: Service and Repair
Preparation
-
Bottom engine compartment panel removed.
-
Front bumper removed.
Removal/Installation
-
Unbolt oil lines (1) and (9) at air-to-oil cooler (2).
Tighten to: 30 Nm.
NOTE: Counter-hold with wrench at air-to-oil cooler (2) when performing this step.
-
Detach springs (5) from left and right mounting plates.
-
Unbolt brackets (10) and (11).
-
Remove air-to-oil cooler (2) with brackets (12) and (13) and rubber bushes (14) and (15).
-
Install in reverse sequence, observing tightening specifications.
-
Check for leaks when engine warm.
NOTE: The oil circulates in the air-to-oil cooler (2) once the temperature thermostat element in the oil filter opens.
-
Check oil level, adjust to correct level.