E 55 AMG Wagon (211.276) V8-5.5L SC (113.990) (2006)
^
Insert new routing clip (A, Figure 16) into wire guide (B) until top of clip (A) is flush with top of wire harness guide (B).
^
Reinstall top of wire harness guide (C, Figure 14).
17.
Attach bracket to the SBC hydraulic unit:
Note:
If mounting bores (arrows, Figure 18) are not present in hydraulic unit proceed to step 18, if bores are present continue with this step.