mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Relays and Modules - Powertrain Management > < AR54.15-P-1255GI Remove/Install Right Footwell Fuse and Relay Box|Page 417
Page 2
background image

3

Remove cover for fuses (1)

NOTE:  Installation: Check gasket for damage

4

Unscrew screws (3) and remove cover for control module section (2)

NOTE:  Installation: Check gasket for damage

5

Unscrew screws (4) and remove fuse and relay holder (5) upwards

6

Mark and disconnect electrical connectors to fuse and relay holder.

NOTE:  Connectors are fitted with mis-plug protection to prevent mix-ups.

-

Assignment and cable connections of fuse blocks

7

Detach electrical screwed connections to fuse and relay holder and remove fuse and relay holder

8

Remove injection system control module

9

Remove traction system control module

10

Unscrew screws (6)

11

Disconnect electrical coupling to blower motor/module box (M2/2)

12

Pull the wiring loom without separation point from the engine or major assemblies compartment with cable retainer out of the fuse and relay
module (F1) and route the wiring loom back into the engine compartment.

13

Remove cover below instrument panel

14

Unhook control cable for hood release (13) from the operating lever and route cable outwards through the fuse and relay module

15

Unscrew nuts (8).

16

Disconnect electrical connectors and connections in the left footwell

NOTE:  This step involves all lines and wiring harnesses which run through the fuse and relay module and do not have a separation point inside
the fuse and relay module.

17

Pull back wiring harnesses to the fuse and relay module

18

Unhook hoses for the windshield washer system from the brackets on the fuse and relay module

19

Remove windshield washer system reservoir

20

Remove fuse and relay module

21

Install in the reverse order

Relays and Modules - Powertrain Management > < AR54.15-P-1255GI Remove/Install Right Footwell Fuse and Relay Box|Page 417