SL 500 (129.067) V8-5.0L (119.982) (1996)
Parts Information
Recommended Labor Time
Model 140
Group: 82
Number: 342
Date: October 1995
SUBJECT:
MODEL 140 MY. 1996
INSTALLATION OF CD CHANGER
1.
Remove hardware from shipping box and verity contents.
2.
Remove shipping screws (2) from CD changer. Place shipping screws in ID card bag. Cover screws holes with dust covers (Figure 1).
2a.
Set orientation adjustment on sides of CD changer to vertical (V). Secure with adhesive covers.
3.
Remove trunk floor mat and left wheel well liner.