SL 500 (230.475) V8-5.0L (113.963) (2004)
4.
Seal anchor (1, 2, 3-Figure 7) all the way around.
5.
Mask A-pillar opening (shaded area Figure 6) with sealing strip. Use 12 x 1.5 mm butyl strip.
6.
Reinstall in opposite order.
7.
Perform leakage test.
III. Penetration By Water Into Area of Paneling Joint For Vario Roof
III.
Penetration by water into area of paneling joint for Vario roof and A-pillar
Cause: