Mariner 2WD L4-2.5L (2009)
-
Stage 2: Tighten to 48 Nm (35 lb-ft).
3. Install the exhaust manifold heat shield and the 4 bolts.
-
Tighten to 10 Nm (89 lb-in).
4. Connect the HO2S electrical connector.
5. Install the exhaust downpipe and exhaust intermediate pipe.