mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Valve Guide > < Valve Cover|Service and Repair|Page 2006
Page 3
background image

3. Install the valve cover, new gasket and retainers.

-

Tighten in the sequence shown to 10 Nm (89 lb-in).

4. Position the wiring harness and attach all of the wiring harness retainers to the valve cover studs.

5. Connect the VCT solenoid electrical connector.

6. Connect the radio capacitor electrical connector.

7. Connect the CMP sensor electrical connector.

8. Connect the CHT sensor electrical connector.

9. Connect the crankcase vent hose.

10. Install the ignition coil-on-plugs. For additional information, refer to Ignition System.

11. NOTE: Make sure the notch on the oil level indicator is aligned with the V-shaped boss on the valve cover and fully engaged into the valve cover.

Install the oil level indicator.

Valve Guide > < Valve Cover|Service and Repair|Page 2006