mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3157 > < Initial Inspection and Diagnostic Overview|Page 3155
Page 50
background image

-

Disconnect: In-Line ILCM C2238 .

-

Ignition ON.

-

Measure the voltage between the in-line ILCM C2238-10, circuit SBP14 (BN/RD), harness side (male) and ground.

-

Is the voltage greater than 10 volts?

Yes

GO to Q2. 

No

VERIFY the Smart Junction Box (SJB) fuse 14 (10A) is OK. If OK, REPAIR the circuit in question. If not OK, REFER to the Wiring Diagrams to
identify the possible causes of the circuit short  See: Diagrams/Electrical Diagrams/Diagrams By Number. CLEAR the DTCs. REPEAT the network test
with the scan tool.

-------------------------------------------------
Q2 CHECK THE ILCM GROUND CIRCUIT FOR AN OPEN

 

-

Ignition OFF.

-

Disconnect: Negative Battery Cable .

-

Measure the resistance between the in-line ILCM C2238-8, circuit GD116 (BK/VT), harness side (male) and ground.

-

Is the resistance less than 5 ohms?

Yes

GO to Q3. 

No

REPAIR the circuit. CONNECT the negative battery cable. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------
Q3 CHECK THE MS-CAN CIRCUITS BETWEEN THE ILCM AND THE DLC FOR AN OPEN

 

-

Measure the resistance between the in-line ILCM C2238-6, circuit VDB06 (GY/OG), harness side (male) and the Data Link Connector (DLC)
C251-3, circuit VDB06 (GY/OG), harness side.

Initial Inspection and Diagnostic Overview|Page 3157 > < Initial Inspection and Diagnostic Overview|Page 3155