mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3239 > < Initial Inspection and Diagnostic Overview|Page 3237
Page 132
background image

-

Disconnect: Battery Energy Control Module (BECM) C4237a .

-

Measure the resistance between the DLC C251-6, circuit VDB04 (WH/BU), harness side and the DLC C251-14, circuit VDB05 (WH), harness
side.

-

Is the resistance less than 5 ohms?

Yes

GO to AE27. 

No

CONNECT the negative battery cable. GO to AE53.

-------------------------------------------------
AE27 CHECK THE HS-CAN (+) AND HS-CAN (-) CIRCUITS FOR A SHORT TOGETHER WITH THE DC/DC DISCONNECTED

 

-

Disconnect: DC/DC C1457d .

-

Measure the resistance between the DLC C251-6, circuit VDB04 (WH/BU), harness side and the DLC C251-14, circuit VDB05 (WH), harness
side.

-

Is the resistance less than 5 ohms?

Yes

REPAIR the circuits. CONNECT all modules. CONNECT the negative battery cable. CLEAR the DTCs. REPEAT the network test with the scan tool. 

No

CONNECT the negative battery cable. GO to AE54.

-------------------------------------------------

AE28-AE54

Communications Network

Pinpoint Tests

Pinpoint Test AE: No High Speed Controller Area Network (HS-CAN) Communication, All Modules Are Not Responding

Refer to Wiring Diagram Set 14 (Fusion/Milan/MKZ, Fusion Hybrid/Milan Hybrid), Module Communications Network for schematic and connector
information.  See: Diagrams/Electrical Diagrams/Diagrams By Number

Normal Operation

The High Speed Controller Area Network (HS-CAN) uses an unshielded twisted pair cable, circuits VDB04 (WH/BU) and VDB05 (WH).

This pinpoint test is intended to diagnose the following:

-

Wiring, terminals or connectors

Initial Inspection and Diagnostic Overview|Page 3239 > < Initial Inspection and Diagnostic Overview|Page 3237