5. Press the accelerator pedal to the floor and hold the pedal just long enough to let the engine get to Wide Open Throttle (WOT) and observe the
TSS_SRC rpm (it should be at ZERO when engine speed has reached maximum rpm). While performing this test, do not hold the throttle open
for more than 5 seconds. See Figure 2.
After the test, place the gear selector in N and run the engine at 1,000 rpm for 15 seconds to cool the torque converter.
10. If the TSS_SRC rpm was ZERO during the Transmission Load Test, then this service procedure is complete and no additional repairs are necessary.
If the TSS_SRC rpm was MORE than ZERO (transmission slipping) during the Transmission Load Test, then proceed to Attachment IV for
transmission repair.
Table of Contents
TRANSMISSION REPAIR PROCEDURE
Pan and Tool Requirements
Transaxle Removal
Transaxle Disassembly
Main Control Valve Body Replacement
Overdrive/Direct Clutch (4, 5, 6) Disassembly and Assembly
Filter Removal and Replacement
Transaxle Assembly
Transaxle Installation and Post Test
Part and Tool Requirements
TRANSMISSION REPAIR PROCEDURE
This transmission repair procedure involves installing a new transmission valve body and clutch packs in the Overdrive/Direct (O/D) and forward clutch
assemblies.