Milan FWD L4-2.5L (2010)
2. Position the leadframe on the Leadframe Guide Pins and carefully install the leadframe by pushing straight down into the solenoids.
3. Remove the Leadframe Guide Pins.
4. Install the 5 leadframe screws.
5. Connect the OSS sensor electrical connector.
6. Connect the TR sensor electrical connector.
7. Install the main control cover grommet.