mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3255 > < Initial Inspection and Diagnostic Overview|Page 3253
Page 123
background image

-

Disconnect: PCM C175b .

-

Measure the resistance between the DLC C251-6, circuit VDB04 (WH/BU), harness side and the DLC C251-14, circuit VDB05 (WH), harness
side.

-

Is the resistance between 108 and 132 ohms?

Yes

For 2.5L gas and 3.0L engine, GO to AE7. 

For 3.5L engine, GO to AE8. 

For 2.5L hybrid, GO to AE9. 

No

For 2.5L gas and 3.0L and 3.5L engine, GO to AE10. 

For 2.5L hybrid, GO to AE11.

-------------------------------------------------
AE7 CHECK THE HS-CAN CIRCUITS BETWEEN THE PCM AND THE DLC FOR AN OPEN - 2.5L GAS AND 3.0L

 

-

Measure the resistance between the PCM C175b-59, circuit VDB04 (WH/BU), harness side and the DLC C251-6, circuit VDB04 (WH/BU),
harness side.

-

Measure the resistance between the PCM C175b-58, circuit VDB05 (WH), harness side and the DLC C251-14, circuit VDB05 (WH), harness
side.

-

Are the resistances less than 5 ohms?

Yes

CONNECT the negative battery cable. GO to AE42. 

No

REPAIR the circuit in question. CONNECT the negative battery cable. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------

Initial Inspection and Diagnostic Overview|Page 3255 > < Initial Inspection and Diagnostic Overview|Page 3253