Cooper (R50) L4-1.6L (W10) (2002)
^
Repeat the operation on the other two groups of wires, remove any remaining protective paper and then bring all three bunches together. Mould the
sealing material into a single cylinder around the harness.
^
Repeat the sealing operation on the second BC1 harness.
Procedure 2: (sealing material already present)
The existing sealing material must be extended in length as follows:
^
Apply two strips of new sealing material to encircle the original sealing material. The illustration shows the first strip being applied.
^
Extend the length of the sealed area by applying 4 new strips of sealing material. The illustration shows the first strip being applied.
NOTE:
the new strips must slightly overlap the original sealing material.
^
Repeat the sealing operation on the second BC1 harness.