Cooper Convertible (R52) L4-1.6L (W10) (2005)
Apply sufficient antiseize compound as deeply as possible between rim and tire.
Position fitting head (1) in direction of rotation before valve (2).
Position holding-down element at 0° to hold tire in well.
Position tire iron (3) on fitting head.