Cooper Convertible (R57) L4-1.6L (N12) (2009)
Unclip front plastic catches (1) in marked area.
If necessary, remove soft top fabric (2) from front bow (front) in direction of arrow.
Detach tension cable (1) at side from roof frame.
Installation:
Secure tension cable (1) to front bow with insulating tape.
Unscrew left and right nuts (1).
Feed out retaining lug (2) on both sides.
Installation:
Press retaining lugs together.