280ZX L6-2753cc 2.8L SOHC (L28E) (1982)
Timing Chain: Service and Repair
INSTALLING TIMING CHAIN
1. Install crankshaft sprocket, oil pump drive gear and oil thrower.
(1) Make sure that the mating marks of crankshaft sprocket face front.
(2) Install oil pump drive gear so that large chamfered inner side faces rear ward.
2. Install timing chain.
Timing Marks
(1) Align timing marks on chain and crankshaft sprocket properly.
(2) Align No.1 mark on camshaft sprocket with timing mark on chain.
(3) Insert camshaft dowel pin into No.1 hole in camshaft sprocket, and install camshaft sprocket bolt.
(4) Install chain guide and chain tensioner. Then tighten slack side chain guide mounting bolt so that protrusion of chain tensioner spindle is 0 mm
(0 in).
Chain guide and chain tensioner mounting bolt: 6 - 10 Nm (0.6 - 1.0 kg-m, 4.3 - 7.2 ft.lb.)