280ZX L6-2753cc 2.8L SOHC (L28E) (1982)
Throttle Position Switch: Testing and Inspection
Insulation Test
1. Connect ohmmeter between chassis ground and terminals 24, 29 and 30 on throttle valve switch.
2. Meter should indicate infinite resistance.
Throttle Position Switch: Testing and Inspection
Insulation Test
1. Connect ohmmeter between chassis ground and terminals 24, 29 and 30 on throttle valve switch.
2. Meter should indicate infinite resistance.