nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Recall - Fuel Injectors & Hoses|Page 2521 > < Recall - Fuel Injectors & Hoses|Page 2519
Page 11
background image

NOTE:

An over tightened clamp may damage the hose and cause a fuel leak.

10.

Install the fuel rail bracket bolts and torque to 13 - 16 ft. lbs. (18 - 28 Nm).

*11. Inspect the injector connectors for damage. If any type of damage is found such as broken connectors, corroded terminals, pins pushed in or bent,

install the sub-harness kit using the Sub-harness Procedure. If the injector subharness(es) do not need to be replaced, continue with this procedure.

12.

Attach the injector connectors to the fuel injectors.

13.

Blow all dirt and dust from the intake manifold, then remove the plastic intake manifold plugs. Be sure to wear protective goggles and respirator
when removing dirt and dust.

14.

Brush a small amount of Permatex High Tack Adhesive Sealant P/N 98H on the intake manifold and set the gasket in place.

15.

Remove the plastic intake plugs from the plenum. Lower the plenum over the engine, align the air duct with the air intake, and rotate the plenum
into place on the manifold. Be sure the air duct and wiring harness are not damaged during installation.

16.

Install the intake manifold bolts, and torque them to 13 - 16 ft. lbs. (18 - 22 Nm).

17.

Install the air duct and tighten clamps.

Assembly - Front

1.

Assemble the front of the engine by completing the following steps:

A.

Reinstall the water and vacuum hoses to the left side of the plenum. (Pay close attention to the throttle chamber hoses near ASCD bracket).

B.

Reconnect the connectors to the throttle sensor and the throttle sensor switch.

C.

Secure the ground wires at the plenum.

D.

Connect the accelerator and ASCD wires to the throttle valve and secure the bracket in place.

Assembly - Rear

1.

Assemble the rear of the engine by completing the following steps:

A.

Connect the air regulator connector and hose.

B.

Connect the water hose to the lower side of the collector.

C.

Install the PCV hose.

D.

Install the FICD air hose and vacuum hoses.

E.

Install the EGR valve upper and lower tube nuts and tighten to 24 - 32 ft. lbs. (33-45 Nm).

F.

Install EGR temperature sensor connector (California only).

2.

Install the plenum ornament cover. Clean all the plenum ornament cover bolt threads with a wire brush. Apply a small amount of Loctite # 222
(purple) to the screw threads and torque each screw to 53 - 69 in. lbs. (6 - 8 Nm).

*3.

Perform an electrical circuit test using the following procedure.

Recall - Fuel Injectors & Hoses|Page 2521 > < Recall - Fuel Injectors & Hoses|Page 2519