nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Turbocharger - Water-Cooled Replacement|Page 2800 > < Turbocharger - Water-Cooled Replacement|Page 2798
Page 9
background image

52.

Install the tie wraps on the coolant lines.

NOTE:

Install the tie wraps carefully, being sure not to crimp or kink the lines (Figure 16).

53.

Install the lower engine cover.

54.

NOTE:     Prior to starting the engine, turn the ignition key to the ON position and make sure that the oil pressure light comes ON. After
starting the engine, the oil pressure light should go OFF within two or three seconds. If it doesn't go OFF, turn the engine OFF immediately
and check the engine oil dipstick level and for possible oil leaks.

55.

Start and run the engine. Check for possible oil or water leaks.

CAUTION:

After starting the engine, do not operate the engine above normal idle speed for at least 2 to 3 minutes.

PIPING KIT COMPONENTS (P/N 14411-01P25)

DESCRIPTION

PART NUMBER

QUANTITY

HOSE - WATER

14056-01P02

1

HOSE - WATER

14056-01P13

1

TUBE ASSEMBLY - WATER INLET

14499-01P02

1

TUBE ASSEMBLY - OIL

15192-01P00

1

BRACKET - AIR INLET PIPE

14467-01P00

1

TIE WRAPS

01552-00411

2

GASKET - EYE BOLT

15189-01P00

4

BOLT - EYE

15188-01P00

2

BOLT - HEX

08120-61233

1

CLAW

24220-05E00

4

HEAT SHIELD - LOWER

74767-02P00

4*

*Only one (1) heat shield is required for this procedure. Discard the remaining heat shields.

Warranty Information

Refer to Section DE in the Warranty Flat Rate Manual.

SERVICE MANUAL CHANGE

Please add the following note to page EF&EC-65 of the 1984 300ZX Service Manual:

"Refer to Technical Bulletin EF86-002 (TS86-031) for turbocharger replacement."

Turbocharger - Water-Cooled Replacement|Page 2800 > < Turbocharger - Water-Cooled Replacement|Page 2798