300ZX Coupe V6-2960cc DOHC (VG30DE) (1994)
Fluid Line/Hose: Testing and Inspection
PRESSURE TESTING
^
Location of line pressure test port
Line pressure test procedure
1. Check A/T and engine fluid levels. If necessary, add.
2. Warm up engine until engine oil and ATF reach operating temperature after vehicle has been driven approx. 10 minutes.
^
ATF operating temperature: 50-80°C (122-176°F)
3. Install pressure gauge to line pressure port.
- D, 2 and 1 positions -
- R position -
4. Set parking brake and block wheels.
^
Continue to depress brake pedal fully while line pressure test at stall speed is performed.
5. Start engine and measure line pressure at idle and stall speed.
^
When measuring line pressure at stall speed, follow the stall test procedure.