nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Air Conditioning Switch|Testing and Inspection|Page 77 > < Exhaust Temperature Sensor|Testing and Inspection
Page 1
background image

Air Conditioning Switch: Testing and Inspection

Fig. 72  A/C control & blower switch testing

1.

Disconnect wiring harness connectors to switch assembly and check continuity with ohmmeter.

3.

Ohmmeter should indicate continuity between terminals as shown in Fig. 72.

Air Conditioning Switch|Testing and Inspection|Page 77 > < Exhaust Temperature Sensor|Testing and Inspection