nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 3703 > < Valve Clearance|Specifications|Page 3701
Page 1
background image

Valve Clearance: Testing and Inspection

INSPECTION 

Perform inspection as follows after removal, installation or replacement of camshaft or valve-related parts, or if there is unusual engine conditions
regarding valve clearance.

1. Remove RH and LH rocker covers with power tool. 
2. Measure valve clearance:

a. Set No.1 cylinder at TDC of its compression stroke.

Align crankshaft pulley timing mark (grooved line without color) with timing indicator.

Check that No. 1 cylinder intake and exhaust cam nose is facing in direction shown in figure.
If not, rotate crankshaft pulley 360° clockwise (when viewed from front).

Valve Clearance|Specifications|Page 3703 > < Valve Clearance|Specifications|Page 3701