nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Emissions/Engine Controls - MIL ON/DTC's P0465/P0442|Page 9556 > < Emissions/Engine Controls - MIL ON/DTC's P0465/P0442|Page 9554
Page 5
background image

a.

From the listed items, find and select "BATTERY CHARGE".

3.

Check the CONSULT-II's "Charger Input" reading (see Figure C).

NOTE:

^

"Battery Voltage" is the voltage level of CONSULT-II's battery.

^

"Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)

IMPORTANT

Do not perform ECU Reprogramming without connecting a battery charger to the vehicle's battery. Permanent ECU damage can occur.

Connecting a vehicle battery charger will maintain:
^

Proper CONSULT-II power supply during reprogramming-very important if the CONSULT-II battery is low.

^

Vehicle battery voltage level-especially on late model vehicles where the cooling fans come on during reprogramming.

Step Three: Reprogram the Vehicle ECM

Step Four: "Wrap-up" After Reprogramming is Finished

1.

Turn the ignition switch "OFF" and CONSULT-II "OFF".

2.

Wait more than 10 seconds, then;

a.

Turn the ignition switch "ON" for 1 second, then

b.

Turn the ignition switch "OFF" again for 10 seconds (see Figure D). This will reset ECM "self learned" Data.

Emissions/Engine Controls - MIL ON/DTC's P0465/P0442|Page 9556 > < Emissions/Engine Controls - MIL ON/DTC's P0465/P0442|Page 9554