nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Valve Guide > < Valve Cover|Diagrams|Page 3095
Page 2
background image

3. Tighten the rocker cover bolts in two steps, in the numerical order as shown.

Rocker cover bolt tightening 1st step:  1.0 - 2.9 Nm (0.1 - 0.3 kg-m, 9 - 26 inch lbs.)
Rocker cover bolt tightening 2nd step:  7.4 - 9.3 Nm (0.75 - 0.95 kg-m, 65 - 82 inch lbs.)

4. Connect the PCV hose and breather hose to the rocker cover. If necessary, install the oil filler cap and PCV valve and lubricate the PCV valve

O-ring with new engine oil.

5. Install the ignition coils.

Valve Guide > < Valve Cover|Diagrams|Page 3095