Altima 2.5 SL L4-2.5L (QR25DE) (2002)
1.
Use the "Labor Operation Flow Chart" to determine the "Labor Operation # " that was performed on this vehicle, then go to step 2.
2.
Match the "Labor Operation # " (that you got from the flow chart on the previous page) with the Labor Operation # in the chart below.
3.
From the appropriate column, select one (and only one):
^
Labor Operation Code (Op-Code) , and
^
FRI (Flat Rate lime)