nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Relays and Modules - Power and Ground Distribution > < Joint Connector (J/C)|Page 7970
Page 1
background image

Multiple Junction Connector: Service and Repair

Installation

Installation

To install Super Multiple Junction (SMJ), tighten bolts until orange "fulltight" mark appears and then retighten to specified torque as required.

3-5 N-m
(0.3 - 0.5 kg-m, 26 - 43 in-lb)

CAUTION:  Do not overtighten bolts, otherwise, it may damage them.

Relays and Modules - Power and Ground Distribution > < Joint Connector (J/C)|Page 7970