nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Revised Oil Pan / Timing Cover Service|Page 1488 > < Revised Oil Pan / Timing Cover Service|Page 1486
Page 6
background image

c. Tighten the oil pan (lower) bolts to the specified torque in numerical order as shown.

4. Installation of the remaining components is in the reverse order of removal.

INSPECTION AFTER INSTALLATION

-

Check fluid levels and add as needed if necessary.

-

Start the engine and check for fluid leaks of any type.

-

Stop engine and wait for 10 minutes.

-

Check all fluid levels again.

-

Check if steering wheel turns smoothly when it is turned several times fully to the left and right lock positions.

TIMING CHAIN COVER

Revised Oil Pan / Timing Cover Service|Page 1488 > < Revised Oil Pan / Timing Cover Service|Page 1486