nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Kickdown Switch|Page 3435 > < A/T - Front Sun Gear Support Bushing Eliminated
Page 1
background image

Throttle Valve Cable/Linkage: Adjustments
Kickdown Switch

Fig. 7  Accelerator Cable Adjusting Nut

Fig. 8  Kickdown Switch Adjustment

1.

Adjust accelerator cable as follows:
a. Tighten adjusting nut, Fig. 7, until throttle drum starts to move, then back off 1 1/2-2 turns and secure with locknut.

2.

Adjust kickdown switch as follows:
a. Adjust clearance ``C'', Fig. 8, between stopper rubber and end of kickdown switch thread while depressing accelerator pedal fully.
b. Clearance ``C'', should be .012-.039 inch.

Kickdown Switch|Page 3435 > < A/T - Front Sun Gear Support Bushing Eliminated