nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Campaign P1213 - VCM Reprogramming|Page 632 > < Campaign P1213 - VCM Reprogramming|Page 630
Page 33
background image

6. Select System Test, and then depress the "down arrow.

7. Select the Manual icon, and then depress NEXT.

8. Select REGULAR FLOODED, and then depress NEXT.

9. Select LIMIT VOLTAGE, and then depress NEXT.

10. Set MIN VOLTAGE to 12.40 volts, and then depress NEXT.

^ Use the arrows to raise and lower the voltage setting.

11. Set the charging time for 40 minutes, and then depress NEXT.

12. Wait for the system to go through Test mode and Advanced Test mode.

13. Perform VCM reprogramming now.

14. Once VCM reprogramming has completed: Depress STOP, depress the power switch to OFF, and then unplug the battery tester charger from the AC
voltage supply.

NOTE:

For further details on battery tester/charger connection and set-up, refer to the battery tester/charger's instruction manual.

Campaign P1213 - VCM Reprogramming|Page 632 > < Campaign P1213 - VCM Reprogramming|Page 630