Leaf ELE-Electric Engine (2011)
21. Wait for both bar graphs to complete.
NOTE:
During the second half of the reprogram, various indicator lamps and information displays in the meter and gauges assembly will flash, along with an
audible sound (i.e., headlights ON). This is normal.