Murano AWD V6-3.5L (VQ35DE) (2009)
INSTALLATION
Install in the reverse order of removal.
With 7 Inch Display
DUCT AND GRILLE
VENTILATOR DUCT : Removal and Installation
REMOVAL
1. Remove the defroster nozzle and side defroster nozzle. Refer to See: Upper Ventilator Duct/Removal And Installation/With 7 Inch Display See:
Defroster Nozzle/Exploded View/With 7 Inch Display.
2. Remove the mounting screws (A), and then remove the ventilator duct (1).
INSTALLATION
Install in the reverse order of removal.