nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Camshaft, Engine|Specifications|Page 2818 > < Camshaft, Engine|Specifications|Page 2816
Page 3
background image

4. Remove the intake and exhaust camshaft brackets.

^

Mark the camshafts, camshaft brackets, and bolts so they are placed in the same position and direction for installation.

^

Equally loosen the camshaft bracket bolts in several steps in the numerical order shown.

5. Remove camshaft.
6. Remove valve lifter.

^

Identify installation positions, and store them without mixing them up.

7. Remove secondary timing chain tensioner from cylinder head.

^

Remove secondary chain tensioner with its stopper pin attached. 

NOTE:  Stopper pin was attached when secondary timing chain was removed.

INSPECTION AFTER REMOVAL 

Camshaft Runout 

1. Put V block on precise flat bed, and support No. 2 and No. 4 journal of camshaft.
2. Set dial gauge vertically to No. 3 journal.
3. Turn camshaft to one direction with hands, and measure camshaft runout on dial gauge. (Total indicator reading)

Limit : 0.05 mm (0.0020 inch) 

4. If it exceeds the limit, replace camshaft.

Camshaft, Engine|Specifications|Page 2818 > < Camshaft, Engine|Specifications|Page 2816