nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Chain|Diagrams|Page 3079 > < Timing Chain|Diagrams|Page 3077
Page 9
background image

a. Tighten the mounting bolts in the numerical order as shown.

^

There are two bolt lengths used. Follow the below for proper bolt length specifications.
Bolt length: Bolt position
20 mm (0.79 inch) :1, 2, 3, 6, 7, 8, 9,10
16 mm (0.63 inch) : Except the above
11.7 - 13.7 Nm (1.2 - 1.4 kgf-cm, 9 - 10 ft. lbs.) 

b. After all bolts are temporarily tightened, retighten them to the specification in the numerical order as shown.

^

If the RTV Silicone Sealant protrudes, wipe it off immediately.

6. After installing rear timing chain case, check surface height difference between following parts on oil pan mounting surface.

Standard
Rear timing chain case to cylinder block: -0.24 to 0.14 mm (-0.0094 to 0.0055 inch) 
^

If not within standard, repeat above installation procedure.

7. Install chain tension guide.

8. Position the crankshaft so No. 1 piston is set at TDC on the compression stroke.

^

Make sure that the dowel pin hole, dowel pin and crankshaft key are located as shown.
Camshaft dowel pin hole (intake side): At cylinder head upper face side in each bank. 
Camshaft dowel pin (exhaust side): At cylinder head upper face side in each bank. 
Crankshaft key: At cylinder head side of RH bank.

CAUTION:  Hole on small dia. side must be used for intake side dowel pin hole. Do not misidentify (ignore big dia. side).

9. Install the timing chains (secondary) and camshaft sprockets.

CAUTION:  Matching marks between the timing chain and sprockets slip easily. Confirm all matching mark positions repeatedly during the
installation process.

a. Push the plunger of the secondary chain tensioner and keep it pressed in with a stopper pin.

Timing Chain|Diagrams|Page 3079 > < Timing Chain|Diagrams|Page 3077