Murano FWD V6-3.5L (VQ35) (2004)
b.
Select (click on) the "To" number.
NOTE:
The "To" number will read: 23710-XXXXX.
3.
Click on the "Add" button.
^
This will add the data you selected to the "File(s) Selected" list.
4.
Write the "To" number on the Repair Order.
5.
Click on "Continue" and follow directions to perform "data transfer" (download) from ASIST into CONSULT-II.
Step Two: Preparation Steps Before Reprogramming ECM
1.
Connect a battery charger to the vehicle's battery. Set the charger to a low charge rate (trickle charge).
CAUTION:
For step 2 below and step 3, DO NOT connect the CONSULT-II A/C Power Supply (see Figure B).
2.
Press [SUB MODE] (see Figure C) then:
a.
From the listed items, find and select [BATTERY CHARGE].