Murano FWD V6-3.5L (VQ35) (2004)
Checking Equipment
NOTE:
-
The CONSULT-II must be used in conjunction with a program card. CONSULT-II does not require loading (Initialization) procedure.
-
Be sure the CONSULT-II is turned off before installing or removing a program card.
CAUTION:
-
If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending on
control unit which carry out CAN communication.
-
If CONVERTER is not connected with CONSULT-II, vehicle occur the "FAIL SAFE MODE" which is "LIGHT UP the HEAD LIGHT" and/or
"COOLING FAN ROTATING" when CONSULT-II is started.
-
Previous CONSULT-II "I" and "Y" DLC-I and DLC-II cables should NOT be used anymore because their DDL connector pins can be damaged
during cable swapping.
NOTE: The DDL1 and DDL2 circuits from DLC pins 12, 13, 14 and 15 may be connected to more than one system. A short in a DDL circuit connected
to a control unit in one system may affect CONSULT-II access to other systems.
CONSULT-II Start Procedure
1. Turn ignition switch OFF.
2. Connect CONSULT-II and CONSULT-II CONVERTER to the data link connector.
3. Turn ignition switch OFF.
4. Touch "START (NISSAN BASED VHCL)" or "System Shortcut" (eg: ENGINE) on the screen.