Murano FWD V6-3.5L (VQ35DE) (2006)
NOTE:
Model Configuration may include items such as engine type, transmission type, and vehicle options such as ASCD, TCS, ABS etc.
b.
Select (click on) the "To" number.
NOTE:
The "To" number will read: 31036-XXXXX.
3.
Click on the "Add" button.
^
This will add the data you selected to the "File(s) Selected" list.
4.
Write the "To" number on the Repair Order.
5.
Click on "Continue" and follow directions to perform "data transfer" (download) from ASIST into CONSULT-II.
Step Two: Preparation Steps Before Reprogramming TCM
1.
Connect a battery charger to the vehicle's battery.
^
Set the charger to a low charge rate (trickle charge).
CAUTION:
For number 2 and number 3 below, DO NOT connect the CONSULT-II A/C Power Supply.
2.
Press [SUB MODE] (see Figure C) then:
a.
From the listed items, find and select [BATTERY CHARGE].