Pathfinder 2WD V6-3.5L (VQ35) (2003)
NOTE: If repairing the A/C system or replacing a component, pour the dye directly into the open system connection and proceed with the service
procedures.
7. Operate the A/C system for a minimum of 20 minutes to mix the dye with the system oil. Depending on the leak size, operating conditions and
location of the leak, it may take from minutes to days for the dye to penetrate a leak and become visible.