nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Relays and Modules - Power and Ground Distribution > < Grounding Point|Locations|Page 9624
Page 1
background image

Multiple Junction Connector: Service and Repair

SUPER MULTIPLE JUNCTION

Installation

To install SMJ, tighten bolts until orange "fulltight" mark appears and then retighten to specified torque as required.

With Tightening Torque:  3 - 5 N.m (0.3 - 0.5 kg.m , 26 - 43 in.lb)

CAUTION:  Do not overtighten bolts, otherwise, they may be damaged.

Relays and Modules - Power and Ground Distribution > < Grounding Point|Locations|Page 9624