Quest V6-3.5L (VQ35DE) (2009)
![background image](/nissan/quest/v6-3.5l_(vq35de)/Page-318007.png)
11. Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
-
Start the engine and check for leaks. Refer to .
-
Inspect the engine oil level. Refer to .
CAUTION:
Wait at least 30 minutes before refilling the engine with oil.