nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Cover|Specifications|Page 1379 > < Timing Cover|Specifications|Page 1377
Page 8
background image

9. Install upper oil pan bolts as shown.

Upper oil pan bolts : 22.0 N-m (2.2 kg-m, 16 ft-lb)

10. Install lower oil pan.

11. Install IVT control valve covers as follows:

a. Install new collared O-rings in front cover oil hole (LH and RH sides).

b. Install new seal rings on the IVT control valve covers.
c. Apply Silicone RTV Sealant to the IVT control valve covers.
- Use Genuine Silicone RTV Sealant, or equivalent.

- Being careful not to move the seal ring from the installation groove, align the dowel pins on the chain case with the holes to install the IVT

control valve covers.

- Tighten the intake valve timing control valve cover bolts in the order as shown.
- A: Bank 1 (Conventional RH bank)
- B: Bank 2 (Conventional LH bank)

Timing Cover|Specifications|Page 1379 > < Timing Cover|Specifications|Page 1377